I have projected
in two months,in september 1994, on site,in the powder milk factory
owned by Nestlé in Araçatuba,Brazil,
a system of unloading tracks loaded with milk coming
from thousands of kilometers, and installed it in one month, with two electricians. It was a system controlled from a control panel fitted with 120 selectors and push
buttons. I had to transform it in a system based on three touchscreen panels made by Nematron and controlled by a PLC
Sistema Automacao
/Reliance Electric. Every function was removed one by one from the
panel and built into the
system PLC/ touchscreen. The factory was running 24hours everydays.
And the last day of november1994, everything was finished and running, with the operators able to run it. |
|
The PC I have used.by Sistema Automation Industrial ;The company had made the migration of the device used to program PLC ‘s Reliance Electric into micro computers. On this picture I was programming a PLC AUTOMATE 40E of 8000
I/0 in This system had only 800 i/os but the loading had 4000 . Everything has been tested in SP and installed in Volta Redonda. Brazil in 1988. |
Working in GERMANY in 2008 |