In order to
be sure that all voltages arrive in the right polarity following can be done.
Before any use of power.
Use of a
battery 9 volts and of an analog dc millivoltmeter. .
The circuit
breaker Q12 should
be ON in the cell 1, in the switchgear
11 kv
circuit breakers 5F22 should be ON in the Wartsilla
synchro panel.
Prepare a
battery 9 volts with
two half meter wires; red for positive and black for negative.
First objective ;verify the polarity of BUSSBAR L1 + and BUSSBAR L2 – and verify that this voltage is
arriving where expected.
observe and note what you see
You will get 90 millivolts but the important
is to see the polarity. through the transient..
if there is a
direct movement of the switch , it is
what is expected.. NOTE IT;
You can re-insert the circuit-breaker in the cell 4.
Do
the same with the generator A;
But
without extracting the circuit breaker 11 kv
of the cell 7.
Do the same with the generator
B;
But without extracting the circuit breaker 11 kv of the cell 9.
Do
the same with the generators
G;
But
without extracting the circuit breaker 11 kv
of the cell 3.
HAVING
DONE THE TEST OF POLARITIES
IT IS POSSIBLE NOW TO CONTINUE TO TEST THE FOLLOWING
There are
several options, depending on which is the more applicable.
If, bussbar G is connected to the bussbar
the
circuit -breakers A and B are inserted but in the position CB_out-drawed., so
that they will not enter on the bussbar if closed.
select
MANUAL SYNCHRONIZATION
select A
to be synchronized so that relay 5K2 is ON
and will
send BUSSBAR voltage and GEN A voltage to the synchronoscope,
the voltmeters and the frequencemeters.
It is now
possible to simulate the closing of the cb breakers A
Injecting
the voltages 5F21 L1 to 4F22 L1 and 5F22 L1
Injecting
the voltages 5F21 L2 to 4F22 L2 and 5F22 L2
The breaker
should get the conditions to close
But it is
not connected to be busbarr.
select
MANUAL SYNCHRONIZATION
select B
to be synchronized so that relay 5K3 is ON
and will
send BUSSBAR voltage and GEN B voltage to the synchronoscope,
the voltmeters and the frequencemeters.
It is now
possible to simulate the closing of the cb breakers B
Injecting
the voltages 5F21 L1 to 6F22 L1 and 6F22 L1
Injecting
the voltages 5F21 L2 to 6F22 L2 and 6F22 L2
The breaker
should get the conditions to close
But it is
not connected to be busbarr.
THE
DIRECTION OF ROTATION OF THE PHASES HAS TO BE DONE BEFORE PROCEEDING OF THE
PARALLELE OPERATION OF A and B
The test of
closure of the breaker GIRASSOL with the synchronoscope
becomes possible.
B or A being in operation and
connected to the bussbar, simulate the closure of the CB 11 kV cell 3 of Girassol being first
drawed out but inserted.
If the synchronoscope accept the closure, you are near of being
successful.
SETTINGS OF
THE SYNCHRONOSCOPE
THE
SCANNING AND RESOLUTION TIME OF THE PLCs should be
read in the PLCs
And
included to 70 ms of the breaker, 10 ms for the relay sending the closure
signal to the PLCs, 10 ms for output of the PLC and 10 ms for the relay in the cell 11 kv, resuming at least 100 ms as closure time without the
value read in the PLC;
|
|
|
MINUS 30° |
BUSSBAR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|